Project

Home > Projects > Bridge

Deda Yellow River Bridge

Deda Railway Yellow River Bridge,at present, it is one of the bridges with relatively novel design in China, with a total length of 8.09274 kilometers and 214 piers. The main bridge structure is a downward - bearing " N" continuous steel truss beam, which is soaring like a " swallow", with a maximum span of 180 meters. It is the railway steel structure bridge with the largest span and longest length in the Yellow River basin.

The main bridge is a ( 120 + 4× 180 + 120 ) meter down-bearing variable-height continuous steel truss beam, the approach bridge across the dike is a 1 - 106 meter simply supported composite arch, the approach bridge inside the dike is a 16 - 56 meter prestressed concrete simply supported box girder, and the approach bridges outside the dike are 24 meter and 32 meter prestressed concrete simply supported T - beams.

With a maximum span of 180 meters, it is the railway steel structure bridge with the largest span and longest length in the Yellow River basin.

Get Started

Fill out the form below or call for information andpricing

Our Wrenches

We supply tools for all grade and size high strength bolt fastening,TC shear wrench,Electric torque control wrench,impact wrench.Our stable working wrenches make bolt fasten easier,Better Wrench,Better Better service.

About Us

We dedicated to supply better tools for high strength bolt fasten,with many years of production experience,SG shear wrench become the most professional shear wrench manufacture in China.