DatangFuzhou Power Plant


The total installed capacity of the power plant is currently Phase I 2? 1000MW Ultra Supercritical Steam Turbine Generator Unit, Phase II Plan 2? The 1000MW ultra-supercritical unit will be equipped with high-efficiency electrostatic precipitator. Phase I Unit 1 is expected to be put into operation in December 2015 and Unit 2 is expected to be put into operation in February 2016. After the two units are put into operation, the annual equipment utilization hours are about 5,000 hours, generating about 800,000 tons of fly ash, 90,000 tons of slag and 21,300 tons of pebble coal each year.


Get Started

Fill out the form below or call for information andpricing

Our Wrenches

We supply tools for all grade and size high strength bolt fastening,TC shear wrench,Electric torque control wrench,impact wrench.Our stable working wrenches make bolt fasten easier,Better Wrench,Better Better service.

About Us

We dedicated to supply better tools for high strength bolt fasten,with many years of production experience,SG shear wrench become the most professional shear wrench manufacture in China.